High-rise façade inspection & repair, CBD tower
Central Business District, Singapore 2026
IRATA rope-access survey and remedial works on a CBD high-rise façade, close-up inspection of every elevation with a photographic condition report.
The problem
The building manager needed a thorough façade condition survey for compliance and to investigate isolated water ingress near the upper floors, without scaffolding an occupied tower in the CBD.
Our approach
We deployed an IRATA-certified rope-access team to descend each elevation, inspecting the façade hands-on rather than from the ground. Defects were located and photographed as the survey progressed.
Method
Rope-access close-up survey of spalling, cracks, hollow tiles, corrosion and sealant condition; targeted sealant replacement and crack sealing on the affected elevations.
Outcome
A full photographic condition report for the building file, plus the priority defects sealed in the same mobilisation, no scaffolding, no closure of the entrances or car park.
On site
Hydroseal rope-access technicians working high above Marina Bay, Singapore
Rope-access technician descending a tower façade with the Marina Bay skyline behindHave a similar project? Let’s talk.
Tell us what’s going wrong and we’ll diagnose the cause, explain your options in plain language, and quote, with no pressure to proceed.
Prefer to talk? Call +65 6289 6811 · We respond within 1 business day.